Flirty Fantasy

Step 1 - Check the contents
Remove all the parts from the box, lay them out, identify them and check the contents.
Step 2 - Choose a Pole Dance location
Select a pole location, measure the ceiling height and place the base in postion.
Step 3 - Choose your extensions
Use the height chart to select any extensions (if required).
Step 4 - Locate the ceiling joists
Locate the ceiling joists by tapping with a finger or using a stud/joist locator. Put the base in position below the joist or joists you are going to use.
Step 5 - Fit the extensions to the base (if required)
Attach any extensions to base insert. Extensions always fit at the bottom of the pole smallest first.
Step 6 - Attach lower main pole.
Screw the lower main pole onto the extension or base insert. Tighten firmly by hand.
Step 7 - Fit adjuster cover
Slide adjuster cover into position just covering the O-ring.
Step 8 - Attach the Upper Dome
Slide the upper dome onto adjuster shaft. X-Pole uses a long adjuster shaft with 3 bearings to lock the dome at 90 degrees to the Pole.
Step 9 - Fit the pole tubes together
Attach upper pole assembly to lower pole. Screw up tightly and hold vertical.
Step 10 - Tighten Adjuster
Unscrew the adjuster by hand until it is firm against the ceiling. Make sure the upper dome is flat.
Step 11 - Tighten the tubes
Tighten the pole sections firmly but not over tight.
Step 12 - Final check
Tighten pole adjuster with spanner or rod until it is really firm. Check for movement and retighten if there is any movement.
Step 13 - Fit adjuster Cover
Slide the adjuster cover up, press in the two sprung pins and lock in place

Step 14 - Ready to go!
After a final check for movement X-pole is ready for use. Where ever it's used X-Pole is up and ready for action in minutes.

Shopping Basket
USD
0 items
$0.00
Recent
Open Back Dress wi..
Recent
X-Pole Professiona..
PayPalPay by Cheques/Check/Other